Uses: Metal cans
Applications:
Soda Ring Pull FOR 2PC CAN is meaning the cans are widely used in soda drinks. Ring Pull tab is one kind of tab for 2pc cans.
The Soda Can is a type of drink in DayZ Standalone. Fronta Lemonade is a parody of Fanta and has similar, orange/white color design as well as a similarly styled logo. This item was added within DayZ 1.12 Pipsi Cola is a parody of Pepsi and has a similar blue/red/white colored can as well as a similarly styled logo which portrays the flag of Czechia. The name "Pipsi" likely derives from Rocket's slight mispronunciation of the name Pepsi in several interview.
Soda Ring Pull FOR 2PC CAN application
Product Description
Soda Ring Pull FOR 2PC CAN | |||
PRODUCT SPECIFICATION | |||
Material |
Aluminium alloy 5182 |
Product Type |
B64 |
End Thickness(mm) |
{{0}}.224mm±0.005 |
Opening/Tab |
RPT |
Outside Curl Diameter |
59.44±0.25mm |
Buckle |
Greater than or equal to 620 kPa |
Lining Type |
Water Based Compound |
Curl height |
2.03±0.20mm |
Temper |
H19/H48 |
Opening size |
Standard Opening End(SOE) |
Coating |
(a) External Lacquer : Epoxy / Clear color( Could be customized according to detail requirement) |
||
Usage |
Used for various beverages, such as: carbonated drinks, functional drinks, beer, Energy drink etc.for 2pc can. |
||
Pallet |
17Bag18Layer590pcs=180,540pcs;NW:500kg GW:535 |
||
Container |
20' Container=20 pallets,3,610,800 pcs; 40' Container=40 pallets,7,221,600 pcs |
Company Profile
Payment Shipping
FAQ
When can I get the price?
We usually quote within 24 hours after we get your inquiry. If it is very urgent, please call us or tell us in email including quantity, specification and other details so that we can give priority to your inquiry.
How long can I expect to get the samples?
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 7 -15 working days based on our existing mould. If not, it will take about 20days to make new mould. The samples will be sent out via express 3-5 workdays.
What about the lead time for mass production?
It depends on the order quantity and the season you place the order. Generally speaking, it will be 25-30 working days after sample approval. We suggest that you may start inquiry two months before the date you would like to get the products at your country.
What are the terms of payment?
EXW, FOB, CFR, CIF, trade assurance order, etc.
http://es.eoebright.com/